Open-plan barn house interior with kitchen island and butler sink

Farm build · Plumbing

Barn house — water and drainage

A 12 × 6 m timber barn on a farm: one open-plan room for kitchen, lounge and dining, with a double-bowl sink and a stove set into the brick island. Behind it, a 3 × 3 m bathroom with bath, WC and basin. Water is stored in a 5 000 L tank on a stand and boosted to the house; drainage falls to two septic tanks in series and a three-trench soakaway.

Open plan

12 × 6 m

Bathroom

3 × 3 m

Water store

5 000 L

Septic

2 × 2 500 L

Install to be carried out and certified by a PIRB-registered plumber.

01 — Site plan

Where everything sits

Building, island, bathroom, tank stand, septic tanks and soakaway on one sheet. The tank sits at the rear, close to the wet wall, so the supply line is short and the pump is easy to reach.

12 0006 0003 0003 000OPEN PLAN — KITCHEN · LOUNGE · DININGTimber rafters · white plaster · concrete slabISLAND 2 400 × 1 000 · SINK + STOVEBATHROOM 3 000 × 3 000bath · WC · basin5 000 LWATER TANK1,5 m galvanised standPUMP0,75 kWfilter + vessel25 mm HDPE · 600 mm cover110 mm uPVC · fall 1:60SEPTIC 12 500 LSEPTIC 22 500 LDBSOAKAWAY — 3 trenches 8 000 × 600 · 19 mm stone + geotextileNLEGENDCold water mainSoil and waste drainBuilding lineTank, pump and filterSeptic tank / distribution boxDimensions in millimetres · trenches and plant positions indicative, to be set out on site

02 — Water supply

From tank to tap

Gravity from the stand, then a booster pump with a pressure vessel holds a steady 350 kPa. Everything downstream is isolated at the manifold.

Diagram 1 — cold water

5 000 L TANKPE, on 1,5 m standBALL VALVE 25 mmfull bore + strainerSEDIMENT FILTER20 micron, replaceableBOOSTER PUMP0,75 kW + 24 L vesselNRV + PRVnon-return · 350 kPahouse entry · 25 mm in sleeve · cold manifold 22 mmISLAND SINK15 mm + isolatorBASIN15 mm + isolatorWC CISTERN15 mm + isolatorBATH15 mm + isolatorYard tap tees off the cold main at the house entry. Fit a drain cock at the lowest point of the run.

Diagram 2 — hot water

GEYSER 150 Lcold feed 22 mm from manifoldT&P VALVEvacuum breakers · drip trayTEMPERING VALVEdelivers 45–50 °C maxHOT MANIFOLD 15 mm19 mm closed-cell laggingISLAND SINK15 mm + isolatorBASIN15 mm + isolatorBATH15 mm + isolatorNo hot water to the WC cistern. Dead legs kept under 2 m so hot water arrives without a long wait.

03 — Drainage

From trap to soakaway

Two separate systems: soil and waste falls to the tanks, and the vent stack keeps every trap sealed. No stormwater enters the septic tanks.

WCØ 110 · 1:60BASINØ 40 · 1:30BATHØ 50 · 1:40ISLAND SINKØ 50 · 1:40Ø110 VENT STACKthrough roof, 100 mm abovecovering, cowl + screenrodding eye at base110 mm uPVC below slab, fall 1:60 · two rodding eyesSEPTIC 12 500 L · first chamberSEPTIC 22 500 L · second chamberDISTRIBUTION BOXbalances 3 trenchesSOAKAWAY3 × 8 m trenchesEvery trap has a 50 mm water seal and a vent path. Falls per SANS 10400-P: Ø110 1:60 · Ø50 1:40 · Ø40 1:30.

04 — Quantities

Pipes, in metres

Every pipe run on the drawings, itemised by zone, with the fall and bedding note for each.

Pipe schedule — lengths in metres

249 m total

Water supply — external

28 m

W-01

25 mm HDPE PN16 (SDR 11) — tank to pump house

In 150 mm sand bed, 600 mm cover, blue marker tape above.

6 m
W-02

25 mm HDPE PN16 (SDR 11) — pump house to house entry

In sleeve through the foundation wall. 600 mm cover.

22 m

Water supply — internal

110 m

W-03

22 mm copper tube — cold main to manifold and geyser

Class 0 (EN 1057). Clipped at 1 000 mm centres.

24 m
W-04

22 mm copper tube — hot main from geyser to manifold

Fully lagged. Keep runs short to limit dead legs.

8 m
W-05

15 mm copper tube — cold branches to fixtures

Isolating valve on every branch.

26 m
W-06

15 mm copper tube — hot branches to fixtures

Dead legs under 2 m where possible.

22 m
W-07

19 mm closed-cell lagging — hot runs

Compress at joints; tape all seams.

30 m

Drainage — internal

51 m

D-01

110 mm uPVC class 34 — WC pan to stack and stack to below slab

Fall 1:60.

8 m
D-02

110 mm uPVC — vent pipe up through the roof

Terminates 100 mm minimum above roof covering, with cowl.

5 m
D-03

50 mm uPVC — bath and island sink wastes

Fall 1:40.

20 m
D-04

40 mm uPVC — basin waste and island sink branch

Fall 1:30.

12 m
D-05

50 mm uPVC — geyser drip-tray overflow and T&P discharge

Discharge to outside, safe position, turned down.

6 m

Drainage — external

60 m

D-06

110 mm uPVC class 34 — house to septic tank

Fall 1:60. Two rodding eyes on the run.

18 m
D-07

110 mm uPVC — septic tank outlet to distribution box

Sealed joints through the tank walls.

10 m
D-08

110 mm perforated uPVC — soakaway distribution

3 trenches × 8 m, laid level in 19 mm stone.

24 m
D-09

50 mm uPVC — tank overflow and washout

Screened outlet, discharge clear of the foundation.

8 m

Total pipe to order

249 m

Lengths include a 10% allowance for bends and offcuts. Copper is sold in 5,5 m lengths — round up each diameter to the next full length when ordering.

05 — Quantities

Fittings and fixtures

Counted for one bathroom plus the island sink, the yard tap and the full tank, pump and septic installation.

01

Water plant — tank and pump house

ItemQtyUnit

5 000 L polyethylene water tank

Vertical, UV-stabilised, 1 200 mm lid

1ea

Galvanised tank stand

1 500 mm high, 4-leg, braced

1ea

Tank outlet ball valve

25 mm brass, full bore

1ea

Tank overflow and washout kit

50 mm, insect screen

1set

Float valve

25 mm, for mains or borehole top-up

1ea

Booster pump

0,75 kW automatic, dry-run protection

1ea

Pressure vessel

24 L, pre-charge 150 kPa

1ea

Sediment filter

25 mm in-line, 20 micron, replaceable element

1ea

Pressure gauge

0–600 kPa, glycerine filled

1ea

HDPE compression elbows

25 mm

4ea

HDPE compression tees

25 mm

2ea

HDPE compression couplings

25 mm

4ea

HDPE male adaptors

25 mm × ¾" BSP

4ea

HDPE end caps

25 mm

2ea
02

Valves and controls

ItemQtyUnit

Brass ball valve

22 mm, full bore

4ea

Isolating valve

15 mm mini ball valve

6ea

Spring non-return valve

22 mm

1ea

Pressure reducing valve

22 mm, set at 350 kPa

1ea

Tempering valve

22 mm thermostatic, set 45–50 °C

1ea

Drain cock

15 mm

2ea

Temperature and pressure relief valve

Geyser T&P, 700 kPa

1ea

Vacuum breaker

15 mm

2ea
03

Copper pipe fittings

ItemQtyUnit

Elbows

22 mm

16ea

Tees

22 mm

8ea

Couplings

22 mm

6ea

Reducing tees

22 × 15 mm

6ea

Elbows

15 mm

22ea

Tees

15 mm

6ea

Couplings

15 mm

8ea

Tap connectors

15 mm × ½"

5ea

Tap connectors

22 mm × ¾"

2ea

End caps

15 mm

6ea

Pipe clips and saddles

22 mm

40ea

Pipe clips and saddles

15 mm

55ea

PTFE tape

12 mm roll

6roll

Hemp and jointing paste

Plumber's kit

1kit
04

Hot water

ItemQtyUnit

Electric geyser

150 L horizontal, 4 kW element, thermostat

1ea

Geyser drip tray

With 50 mm overflow

1ea

Flexible geyser connections

22 mm

2ea
05

Internal drainage — uPVC

ItemQtyUnit

Bends

110 mm × 45°

10ea

Long-radius bends

110 mm × 90°

4ea

Y-junctions

110 mm × 110 mm

3ea

Reducing Y-junctions

110 × 50 mm

5ea

Inspection / rodding eyes

110 mm with screwed cap

3ea

Vent cowl

110 mm with insect screen

1ea

Socket couplings

110 mm

6ea

Pipe brackets

110 mm

20ea

WC pan connector

110 mm flexible

1ea

Bends

50 mm × 45°

12ea

Tees

50 mm

3ea

Socket couplings

50 mm

5ea

Pipe brackets

50 mm

24ea

Bends

40 mm × 45°

8ea

Tees

40 mm

3ea

Socket couplings

40 mm

4ea

Pipe brackets

40 mm

12ea

Bath P-trap with waste and overflow

40/50 mm

1set

Bottle trap

40 mm

1ea

Deep-seal P-trap (island sink)

50 mm

1ea

Floor gully

110 mm with trap

1ea

Wall sleeve through foundation

110 mm

2ea

Solvent cement

500 ml

2tin

PVC primer

250 ml

1tin
06

Septic tank and soakaway

ItemQtyUnit

Septic tank

2 500 L two-chamber, in series

2ea

Inlet and outlet connection kits

110 mm, per tank

2set

Inspection covers

600 × 450 mm, sealed

3ea

Distribution box

110 mm, 4-way

1ea

19 mm crushed stone — soakaway fill

Washed

4m³

Non-woven geotextile

Burial membrane over stone

60m²

River sand bedding

Around all buried pipes

2m³

Blue marker tape

Buried water line

30m
07

Fixtures and tapware

ItemQtyUnit

Butler sink and basket waste

Fireclay, 600 × 460 mm

1ea

Kitchen mixer

Swivel spout, 15 mm tails

1ea

Pedestal basin and waste

550 mm

1ea

Basin mixer

15 mm tails

1ea

Close-coupled WC suite

With soft-close seat

1ea

Bath

1 700 mm, with floor-standing filler and waste

1ea

Yard tap

Brass bibtap on standpipe

1ea

Angle valves

15 mm, WC and basin

2ea

06 — Visual reference

What it looks like built

Tank and pump house, septic field, the material order, the bathroom — plus a short walkthrough.

The build today

On site — kitchen island

On site — kitchen island

Double-bowl stainless sink set into the brick island base, with the stove position beside it. White plaster, dark-stained rafters, charcoal curtains at the glazing.

On site — bathroom

On site — bathroom

The 3 × 3 m bathroom corner as it stands: oak vanity in position, black-framed panel on the wall, fixtures still on the slab awaiting first fix.

The services, specified

Tank and pump house

Tank and pump house

5 000 L tank on a 1,5 m stand, booster pump, 20 micron filter and brass manifold, fed by a 25 mm HDPE line in a sand-bedded trench.

Septic tanks and soakaway

Septic tanks and soakaway

Two 2 500 L tanks in series with 110 mm uPVC connections, green inspection covers, and three stone-filled soakaway trenches fed from a distribution box.

Pipes and fittings

Pipes and fittings

HDPE coil, 110 mm and 50 mm uPVC, 22 mm and 15 mm copper, ball valves, traps and solvent cement — the full order laid out.

Bathroom, finished

Bathroom, finished

Bath, WC and basin with the vent stack rising inside the rear wall.

Walkthrough — from the buried supply line to the finished interior

The first two photographs are of the house as it stands. Everything below them is an illustrative render of the specified system, not a photograph of the site — positions must be set out on site and confirmed against the tank, pump and septic suppliers' installation guides.

07 — Specification

Notes the installer works to

Depths, falls, testing and compliance for a South African farm installation.

01

Water source and storage

The 5 000 L tank sits on a 1,5 m stand so the pump always has a positive head. Fill the tank by borehole, rainwater harvest or a municipal standpipe; fit a 25 mm float valve if it is topped up automatically. Treat the tank as the primary store, not a reservoir for the whole site.

02

Pressure

Gravity alone gives roughly 15 kPa at the stand height — not enough for a shower or a mixer. The 0,75 kW booster set with a 24 L pressure vessel holds 250–350 kPa at the fixtures. Fit a pressure reducing valve after the pump and set it to 350 kPa; anything above 400 kPa will hammer the copper and shorten the geyser's life.

03

Pipe sizes

25 mm HDPE buried, 22 mm copper as the internal cold and hot mains, 15 mm branches to each fixture. Keeping the mains at 22 mm is what stops the shower from stalling when someone opens the kitchen tap.

04

Buried water lines

600 mm cover, 150 mm sand bedding above and below the pipe, and blue marker tape at 300 mm so the line is never spade-hit. Sleeve every entry through the foundation and seal the sleeve. The Eastern Cape and Western Cape have no frost depth to worry about, but clay movement does break pipes — bed them properly.

05

Drainage falls

SANS 10400-P falls: 110 mm soil at 1:60, 50 mm waste at 1:40, 40 mm waste at 1:30. Every fixture gets a trap with a water seal of at least 50 mm, and every trap gets a vent path — either the main stack or an air admittance valve. A trap without a vent gurgles and pulls the seal.

06

Ventilation

One 110 mm vent stack, taken 100 mm above the roof covering and finished with a cowl and insect screen. No vent, no system: the drains will smell and the traps will empty.

07

Septic tank sizing

Two 2 500 L tanks in series give 5 000 L of working volume — comfortably above the 1 500 L minimum for a single bathroom, and enough to ride out weekends when the house is full. Desludge the first chamber every three to five years; keep the second chamber's outlet clear.

08

Soakaway

Three trenches of 8 m × 0,6 m wide × 0,6 m deep, filled with washed 19 mm stone and wrapped in geotextile, fed through a distribution box so no single trench takes the whole flow. Keep the soakaway at least 30 m from any borehole or well, 5 m from a boundary and well clear of the tank stand — and never below the level of the water table in winter.

09

What the septic tank must not receive

No bleach in quantity, no cooking fat, no sanitary products, no disposable wipes, no stormwater. The kitchen island sink is the risk point: keep a strainer basket in it and consider a small grease trap if you cook with a lot of fat.

10

Hot water safety

A 150 L geyser with a T&P valve, two vacuum breakers and a drip tray piped to outside. Fit a tempering valve so nothing above 50 °C reaches the bath or basin. Bond and earth the geyser, and put it on a timer if the farm runs on solar.

11

Testing and commissioning

Pressure-test the water installation at 1,5× working pressure for one hour before closing up walls. Chlorinate the tank (50 mg/L, 24 hours, then flush), then have the water tested for coliforms and E. coli before drinking from it. Flood-test the drains and check every trap for a seal.

12

Compliance

In South Africa the installation must be done and signed off by a PIRB-registered plumber, who issues a Certificate of Compliance for the water installation under SANS 10252 and 10400-P. Keep the CoC with the house documents — you will need it for insurance and for any future sale.

Drawings are schematic and for pricing and briefing. Set out on site, confirm invert levels against the actual tank and septic tank inlets, and have the installation designed and signed off by a PIRB-registered plumber in terms of SANS 10252 and SANS 10400-P.