A 12 × 6 m timber barn on a farm: one open-plan room for kitchen, lounge and dining, with a double-bowl sink and a stove set into the brick island. Behind it, a 3 × 3 m bathroom with bath, WC and basin. Water is stored in a 5 000 L tank on a stand and boosted to the house; drainage falls to two septic tanks in series and a three-trench soakaway.
Open plan
12 × 6 m
Bathroom
3 × 3 m
Water store
5 000 L
Septic
2 × 2 500 L
Install to be carried out and certified by a PIRB-registered plumber.
01 — Site plan
Where everything sits
Building, island, bathroom, tank stand, septic tanks and soakaway on one sheet. The tank sits at the rear, close to the wet wall, so the supply line is short and the pump is easy to reach.
02 — Water supply
From tank to tap
Gravity from the stand, then a booster pump with a pressure vessel holds a steady 350 kPa. Everything downstream is isolated at the manifold.
Diagram 1 — cold water
Diagram 2 — hot water
03 — Drainage
From trap to soakaway
Two separate systems: soil and waste falls to the tanks, and the vent stack keeps every trap sealed. No stormwater enters the septic tanks.
04 — Quantities
Pipes, in metres
Every pipe run on the drawings, itemised by zone, with the fall and bedding note for each.
Pipe schedule — lengths in metres
249 m total
Water supply — external
28 m
| W-01 | 25 mm HDPE PN16 (SDR 11) — tank to pump house In 150 mm sand bed, 600 mm cover, blue marker tape above. | 6 m |
| W-02 | 25 mm HDPE PN16 (SDR 11) — pump house to house entry In sleeve through the foundation wall. 600 mm cover. | 22 m |
Water supply — internal
110 m
| W-03 | 22 mm copper tube — cold main to manifold and geyser Class 0 (EN 1057). Clipped at 1 000 mm centres. | 24 m |
| W-04 | 22 mm copper tube — hot main from geyser to manifold Fully lagged. Keep runs short to limit dead legs. | 8 m |
| W-05 | 15 mm copper tube — cold branches to fixtures Isolating valve on every branch. | 26 m |
| W-06 | 15 mm copper tube — hot branches to fixtures Dead legs under 2 m where possible. | 22 m |
| W-07 | 19 mm closed-cell lagging — hot runs Compress at joints; tape all seams. | 30 m |
Drainage — internal
51 m
| D-01 | 110 mm uPVC class 34 — WC pan to stack and stack to below slab Fall 1:60. | 8 m |
| D-02 | 110 mm uPVC — vent pipe up through the roof Terminates 100 mm minimum above roof covering, with cowl. | 5 m |
| D-03 | 50 mm uPVC — bath and island sink wastes Fall 1:40. | 20 m |
| D-04 | 40 mm uPVC — basin waste and island sink branch Fall 1:30. | 12 m |
| D-05 | 50 mm uPVC — geyser drip-tray overflow and T&P discharge Discharge to outside, safe position, turned down. | 6 m |
Drainage — external
60 m
| D-06 | 110 mm uPVC class 34 — house to septic tank Fall 1:60. Two rodding eyes on the run. | 18 m |
| D-07 | 110 mm uPVC — septic tank outlet to distribution box Sealed joints through the tank walls. | 10 m |
| D-08 | 110 mm perforated uPVC — soakaway distribution 3 trenches × 8 m, laid level in 19 mm stone. | 24 m |
| D-09 | 50 mm uPVC — tank overflow and washout Screened outlet, discharge clear of the foundation. | 8 m |
Total pipe to order
249 m
Lengths include a 10% allowance for bends and offcuts. Copper is sold in 5,5 m lengths — round up each diameter to the next full length when ordering.
05 — Quantities
Fittings and fixtures
Counted for one bathroom plus the island sink, the yard tap and the full tank, pump and septic installation.
Water plant — tank and pump house
| Item | Qty | Unit |
|---|---|---|
5 000 L polyethylene water tank Vertical, UV-stabilised, 1 200 mm lid | 1 | ea |
Galvanised tank stand 1 500 mm high, 4-leg, braced | 1 | ea |
Tank outlet ball valve 25 mm brass, full bore | 1 | ea |
Tank overflow and washout kit 50 mm, insect screen | 1 | set |
Float valve 25 mm, for mains or borehole top-up | 1 | ea |
Booster pump 0,75 kW automatic, dry-run protection | 1 | ea |
Pressure vessel 24 L, pre-charge 150 kPa | 1 | ea |
Sediment filter 25 mm in-line, 20 micron, replaceable element | 1 | ea |
Pressure gauge 0–600 kPa, glycerine filled | 1 | ea |
HDPE compression elbows 25 mm | 4 | ea |
HDPE compression tees 25 mm | 2 | ea |
HDPE compression couplings 25 mm | 4 | ea |
HDPE male adaptors 25 mm × ¾" BSP | 4 | ea |
HDPE end caps 25 mm | 2 | ea |
Valves and controls
| Item | Qty | Unit |
|---|---|---|
Brass ball valve 22 mm, full bore | 4 | ea |
Isolating valve 15 mm mini ball valve | 6 | ea |
Spring non-return valve 22 mm | 1 | ea |
Pressure reducing valve 22 mm, set at 350 kPa | 1 | ea |
Tempering valve 22 mm thermostatic, set 45–50 °C | 1 | ea |
Drain cock 15 mm | 2 | ea |
Temperature and pressure relief valve Geyser T&P, 700 kPa | 1 | ea |
Vacuum breaker 15 mm | 2 | ea |
Copper pipe fittings
| Item | Qty | Unit |
|---|---|---|
Elbows 22 mm | 16 | ea |
Tees 22 mm | 8 | ea |
Couplings 22 mm | 6 | ea |
Reducing tees 22 × 15 mm | 6 | ea |
Elbows 15 mm | 22 | ea |
Tees 15 mm | 6 | ea |
Couplings 15 mm | 8 | ea |
Tap connectors 15 mm × ½" | 5 | ea |
Tap connectors 22 mm × ¾" | 2 | ea |
End caps 15 mm | 6 | ea |
Pipe clips and saddles 22 mm | 40 | ea |
Pipe clips and saddles 15 mm | 55 | ea |
PTFE tape 12 mm roll | 6 | roll |
Hemp and jointing paste Plumber's kit | 1 | kit |
Hot water
| Item | Qty | Unit |
|---|---|---|
Electric geyser 150 L horizontal, 4 kW element, thermostat | 1 | ea |
Geyser drip tray With 50 mm overflow | 1 | ea |
Flexible geyser connections 22 mm | 2 | ea |
Internal drainage — uPVC
| Item | Qty | Unit |
|---|---|---|
Bends 110 mm × 45° | 10 | ea |
Long-radius bends 110 mm × 90° | 4 | ea |
Y-junctions 110 mm × 110 mm | 3 | ea |
Reducing Y-junctions 110 × 50 mm | 5 | ea |
Inspection / rodding eyes 110 mm with screwed cap | 3 | ea |
Vent cowl 110 mm with insect screen | 1 | ea |
Socket couplings 110 mm | 6 | ea |
Pipe brackets 110 mm | 20 | ea |
WC pan connector 110 mm flexible | 1 | ea |
Bends 50 mm × 45° | 12 | ea |
Tees 50 mm | 3 | ea |
Socket couplings 50 mm | 5 | ea |
Pipe brackets 50 mm | 24 | ea |
Bends 40 mm × 45° | 8 | ea |
Tees 40 mm | 3 | ea |
Socket couplings 40 mm | 4 | ea |
Pipe brackets 40 mm | 12 | ea |
Bath P-trap with waste and overflow 40/50 mm | 1 | set |
Bottle trap 40 mm | 1 | ea |
Deep-seal P-trap (island sink) 50 mm | 1 | ea |
Floor gully 110 mm with trap | 1 | ea |
Wall sleeve through foundation 110 mm | 2 | ea |
Solvent cement 500 ml | 2 | tin |
PVC primer 250 ml | 1 | tin |
Septic tank and soakaway
| Item | Qty | Unit |
|---|---|---|
Septic tank 2 500 L two-chamber, in series | 2 | ea |
Inlet and outlet connection kits 110 mm, per tank | 2 | set |
Inspection covers 600 × 450 mm, sealed | 3 | ea |
Distribution box 110 mm, 4-way | 1 | ea |
19 mm crushed stone — soakaway fill Washed | 4 | m³ |
Non-woven geotextile Burial membrane over stone | 60 | m² |
River sand bedding Around all buried pipes | 2 | m³ |
Blue marker tape Buried water line | 30 | m |
Fixtures and tapware
| Item | Qty | Unit |
|---|---|---|
Butler sink and basket waste Fireclay, 600 × 460 mm | 1 | ea |
Kitchen mixer Swivel spout, 15 mm tails | 1 | ea |
Pedestal basin and waste 550 mm | 1 | ea |
Basin mixer 15 mm tails | 1 | ea |
Close-coupled WC suite With soft-close seat | 1 | ea |
Bath 1 700 mm, with floor-standing filler and waste | 1 | ea |
Yard tap Brass bibtap on standpipe | 1 | ea |
Angle valves 15 mm, WC and basin | 2 | ea |
06 — Visual reference
What it looks like built
Tank and pump house, septic field, the material order, the bathroom — plus a short walkthrough.
The build today

On site — kitchen island
Double-bowl stainless sink set into the brick island base, with the stove position beside it. White plaster, dark-stained rafters, charcoal curtains at the glazing.

On site — bathroom
The 3 × 3 m bathroom corner as it stands: oak vanity in position, black-framed panel on the wall, fixtures still on the slab awaiting first fix.
The services, specified

Tank and pump house
5 000 L tank on a 1,5 m stand, booster pump, 20 micron filter and brass manifold, fed by a 25 mm HDPE line in a sand-bedded trench.

Septic tanks and soakaway
Two 2 500 L tanks in series with 110 mm uPVC connections, green inspection covers, and three stone-filled soakaway trenches fed from a distribution box.

Pipes and fittings
HDPE coil, 110 mm and 50 mm uPVC, 22 mm and 15 mm copper, ball valves, traps and solvent cement — the full order laid out.

Bathroom, finished
Bath, WC and basin with the vent stack rising inside the rear wall.
The first two photographs are of the house as it stands. Everything below them is an illustrative render of the specified system, not a photograph of the site — positions must be set out on site and confirmed against the tank, pump and septic suppliers' installation guides.
07 — Specification
Notes the installer works to
Depths, falls, testing and compliance for a South African farm installation.
Water source and storage
The 5 000 L tank sits on a 1,5 m stand so the pump always has a positive head. Fill the tank by borehole, rainwater harvest or a municipal standpipe; fit a 25 mm float valve if it is topped up automatically. Treat the tank as the primary store, not a reservoir for the whole site.
Pressure
Gravity alone gives roughly 15 kPa at the stand height — not enough for a shower or a mixer. The 0,75 kW booster set with a 24 L pressure vessel holds 250–350 kPa at the fixtures. Fit a pressure reducing valve after the pump and set it to 350 kPa; anything above 400 kPa will hammer the copper and shorten the geyser's life.
Pipe sizes
25 mm HDPE buried, 22 mm copper as the internal cold and hot mains, 15 mm branches to each fixture. Keeping the mains at 22 mm is what stops the shower from stalling when someone opens the kitchen tap.
Buried water lines
600 mm cover, 150 mm sand bedding above and below the pipe, and blue marker tape at 300 mm so the line is never spade-hit. Sleeve every entry through the foundation and seal the sleeve. The Eastern Cape and Western Cape have no frost depth to worry about, but clay movement does break pipes — bed them properly.
Drainage falls
SANS 10400-P falls: 110 mm soil at 1:60, 50 mm waste at 1:40, 40 mm waste at 1:30. Every fixture gets a trap with a water seal of at least 50 mm, and every trap gets a vent path — either the main stack or an air admittance valve. A trap without a vent gurgles and pulls the seal.
Ventilation
One 110 mm vent stack, taken 100 mm above the roof covering and finished with a cowl and insect screen. No vent, no system: the drains will smell and the traps will empty.
Septic tank sizing
Two 2 500 L tanks in series give 5 000 L of working volume — comfortably above the 1 500 L minimum for a single bathroom, and enough to ride out weekends when the house is full. Desludge the first chamber every three to five years; keep the second chamber's outlet clear.
Soakaway
Three trenches of 8 m × 0,6 m wide × 0,6 m deep, filled with washed 19 mm stone and wrapped in geotextile, fed through a distribution box so no single trench takes the whole flow. Keep the soakaway at least 30 m from any borehole or well, 5 m from a boundary and well clear of the tank stand — and never below the level of the water table in winter.
What the septic tank must not receive
No bleach in quantity, no cooking fat, no sanitary products, no disposable wipes, no stormwater. The kitchen island sink is the risk point: keep a strainer basket in it and consider a small grease trap if you cook with a lot of fat.
Hot water safety
A 150 L geyser with a T&P valve, two vacuum breakers and a drip tray piped to outside. Fit a tempering valve so nothing above 50 °C reaches the bath or basin. Bond and earth the geyser, and put it on a timer if the farm runs on solar.
Testing and commissioning
Pressure-test the water installation at 1,5× working pressure for one hour before closing up walls. Chlorinate the tank (50 mg/L, 24 hours, then flush), then have the water tested for coliforms and E. coli before drinking from it. Flood-test the drains and check every trap for a seal.
Compliance
In South Africa the installation must be done and signed off by a PIRB-registered plumber, who issues a Certificate of Compliance for the water installation under SANS 10252 and 10400-P. Keep the CoC with the house documents — you will need it for insurance and for any future sale.